SE Ga Road Work: Weekly Traffic Interruption Advisory through August 12 - AllOnGeorgia

2022-08-13 00:05:15 By : Ms. charlene chen

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, August 6 through Friday, August 12.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.

I-95                                                      McIntosh County Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0) Lane Closures for Bridge Maintenance/Rehabilitation Mon.- Thurs. 7pm-7am Weekends-9pm Fri. until 5am, Mon.

From Mildred St. to Railroad Bridge (MP 6.68) Chatham County  Shoulder Paving and Grinding Operations Nightly Lane Closures Friday 8/05 – 8/12

EB Exit 3 Off Ramp Closure/Detour for Asphalt Shoulder Paving Beginning Friday 8/05 -08/07 Follow Detour Signs Along Route

Bridge & Road Closures with Detours 

Ogeechee Creek @ Ogeechee Rd   Screven County  Road Closure for Bridge Replacement Expected Reopens Early September Detour via Goloid Church Rd., US 301 East, Goloid Church Rd. West

US 82                                                  Brantley County  Westbound (WB) Bridge Replacement Project 3 Miles West of Hoboken @ Big Creek-Onsite Detour New WB Bridge Scheduled to Open in Early 2023 Single Lane Traffic in Both Directions thru Work Zone Detour: WB Traffic Shift to EB Bridge

Reedy Creek @ Stanfield Rd              Wayne County  Road Closure for Bridge Replacement Expected Reopens January 14, 2023. Detour via Michael Mikell Lake Rd., Tyre Bridge Rd., US 84.

S. Howard Street                                Camden County  Road Closure for Construction on SR 40 Starting July 25, 2022. Expected Reopens August 25, 2022 Detour via Grove Blvd., SR 40

Piney Grove Rd at Colemans Creek    Appling County  Road Closure for Bridge Replacement Expected to Reopen December 31, 2022 Detour via SR 203/SR 121/SR 15

Bridge Construction, Rehabilitation, and Maintenance 

SR 4/US 1 Over Altamaha River           Appling-Toombs Co. West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.) Daily Lane Closures for Bridge Construction Activities Monday thru Friday, 7am to 6pm (Completion Dec.)

SR 86                                                 Toombs County Between SR 30/US 280 (MP 0) & Emanuel County Line (MP 12.96) Near Tobacco Rd. Daily lane closures to overlay existing pavement

SR 204/Fort Argyle Rd.                     Chatham County  From Old River Rd to Gateway Blvd Lane Closures for Asphalt Resurfacing 7pm to 6am, 8/05 to 8/12 (8/31/2022)

SR 307/Dean Forest Rd.                   Chatham County  From SR 21 To US 80 Lane Closure for Traffic Signal Work 6pm to 7am, 8/05 to 8/12

SR 307/Dean Forest Rd.                   Chatham County   From I-16 to Hwy 80 Daily/Nightly Lane Closures for Resurfacing 6pm to 7am Friday 8/05 – Friday 8/12

SR 27                                                  Wayne County  East Railroad St to the Glynn County Line MP 7.33 to MP 35.41 Daily/Nightly Lane Closures for Resurfacing 4/20/22 – 8/31/22

SR 73                                                  Tattnall County  North of SR 144 to the Evans Co. Line Lane Closures for Installing Final Striping Daily Lane Closures 7am – 8pm Starting 7/30/2022 – 8/15/2022

SR 520                                                Ware County  Atkinson Co Line MP .0 to Anita St. MP 19.6 Daily Lane Closures for Resurfacing 7am to 8pm Starting 6/21/22 to 10/31/22

SR 56                                                 Toombs County  Paul Lockley Rd to Underwood Rd Daily Lane Closures for Resurfacing 6:30am to 7pm Starting 7/28/22 to 8/31/2022

SR 132                                                Telfair County Between Murry Ln & McRae Milan Rd (MP 15 to 19) Daily lane closures to repair cross drain pipes

SR25 NB at I-516 WB On-Ramp        Chatham County  From Blossom Drive to Millis Lane (MP 10.61) Turn Lane Extension at WB I-516 On-Ramp Daily Lane Closures 9am – 3pm 8/08- Friday 8/12 (08/24/2022)

SR 21/SR 30                                      Chatham County    I-95/SR 405 to Berrien Rd Lane Closures for Earth Work on Shoulders and Median Starting 7pm-6am Monday 08/08/22- 8/12/22 (8/26/2022)

SR 40                                                  Camden County  West of Grove Blvd to East of Truss Plant Road Widening and Reconstruction for Additional Turn Lanes Lane Closures Monday thru Friday, 7am to 5pm

SR 21                                                  Effingham County  MP 6.6 to MP 27.7 Lane Closures for Installation of Cable Barrier Lane Closures Monday – Friday  9am-3:30pm & 7pm-6am Daily/Nightly Lane Closures Saturday and Sunday

Your email address will not be published. Required fields are marked *

Save my name, email, and website in this browser for the next time I comment.

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction...

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on...

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on...

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on...